News

Mahindra Revises Electric Vehicle Charging Policy for 2025

Published by
Team GaadiFy

Mahindra has revised its charging policy for electric SUVs, giving buyers the flexibility to skip the previously mandatory charger and installation under three conditions:

  • If your home or workplace lacks provisions for a private charger.
  • If you already own a charger that meets Mahindra’s safety standards.
  • If your family is purchasing multiple Mahindra e-SUVs and can manage with a single charging point.

Notably, Mahindra offers a 7.2kW AC charger for ₹50,000 and an 11.2kW AC charger for ₹75,000, which were earlier required purchases with its electric SUVs.

Mahindra BE 6 and XEV 9e: Variants, Pricing & Charging Details

The BE 6 and XEV 9e are available with two battery pack options: –

  • 59kWh battery (available in multiple variants)
  • 79kWh battery (exclusive to the top-end Pack Three model)

Charging times for different chargers:

  • 11kW charger: 6 hours (59kWh) | 8 hours (79kWh)
  • 7.2kW charger: 8.7 hours (59kWh) | 11.7 hours (79kWh)

Also Read: Mahindra Scorpio N Carbon Launched At Rs 19.19 Lakh

Mahindra BE 6 Price List

VariantPrice (₹ Lakh)With 7.2kW Charger (+₹50,000)With 11.2kW Charger (+₹75,000)
Pack One (59kWh)18.9019.4019.65
Pack One Above (59kWh)20.5021.0021.25
Pack Two (59kWh)21.9022.4022.65
Pack Three Select (59kWh)24.5025.0025.25
Pack Three (79kWh)26.9027.4027.65

Mahindra XEV 9e Pricing

The XEV 9e shares its battery pack options with the BE 6 and offers the same charging speeds. However, it does not come in the “Pack One Above” variant.

VariantPrice (₹ Lakh)With 7.2kW Charger (+₹50,000)With 11.2kW Charger (+₹75,000)
Pack One (59kWh)21.9022.4022.65
Pack Two (59kWh)24.9025.4025.65
Pack Three Select (59kWh)27.9028.4028.65
Pack Three (79kWh)30.5031.0031.

Also Read: Mahindra Reports 15% Growth in Auto Sales for February 2025, SUV Sales Surge by 19%

Published by
Team GaadiFy
  • This website uses cookies.

    Read More